About Research

Search for PARI Report/Technical Note

Proposal of Pile Connection Method with Precast Superstructure for Port Pier

Publication year Port and Airport Research Institute Technical Note 1359 2019.08
Author(s) Yuichiro KAWABATA,Katsuya IKENO,Ema KATO,Mitsuyasu IWANAMI
Department
/Divison
Structural Engineering Field Structural Mechanics Group
Executive Summary

Recently, construction method for precast superstructures of port piers is required to minimize offshore operation after pipe driving. However, technical issues exist to connect precast concrete with steel pipe piles at the rigidity condition which is based on port design criteria. In this paper, “sleeve tube type” method is proposed to solve the connection problem of precast concrete and steel pipe piles without reducing workability. Mechanism focusing on the connection fixation of precast concrete and steel pipe piles is discussed through the cyclic loading experiment. Next, conducted a three-dimensional nonlinear finite element analysis on cyclic loading experiment of “sleeve tube type”, examined the effect of shear key, the insert length of steel pipe pile into sleeve tube, and discussed the stress transmission mechanism of the connection. Furthermore, a practical design method for the “sleeve tube type” was proposed. Finally, points to be noted both the method for precast superstructures and applying the “sleeve tube type” are shown.

Key Words: Precast concrete, pile connection, sleeve tube type, cyclic loading experiment,finite element analysis, performance evaluation

PDF File