Search for PARI Report/Technical Note
Development of Execution Control System for Pile Driving
Publication year | Port and Airport Research Institute Report 031-03-05 1992.09 |
---|---|
Author(s) | Koji ISHIZUKA,Takashi NEMOTO,Yoshihisa HAYASHIDA |
Department /Divison |
Machinery Division Instrumental Construction Control Laboratory |
Executive Summary | This paper describes the development of a new system which can automate the execution control of pile driving work which have been done by man power. The new system is composed of a laser Doppler velocimeter and a personal computer. The driving displacement of a pile is measured by direct radiation of laser to the surface of the pile using a laser Doppler velocimeter. The measuring performance and precision were clarified through model experiments and field tests in pile driving |
PDF File | /en/pdf/en/vol031-no03-05.pdf |